Engineered for stadium-grade tours and large outdoor festivals, the EAGLE 20M Delay Tower delivers high-capacity PA rigging with crane-free deployment and maximum ground stability.

Key Specs:
- 20M Vertical Reach: Optimized long-throw projection for massive crowd coverage.
- 10 TONS Total Capacity: Heavy-duty structure designed for large line array clusters.
- 2.5 TONS Per Side Rigging: High-load side arms for main arrays, side-fills, or subs.
- Integrated Electric Drive: Smooth, crane-free self-climbing mechanism that cuts setup time and labor.
- 12 TONS Heavy Ballast Base: High-mass anchor system engineered for extreme wind resistance.
Rock-solid, repeatable performance for the world’s stages. Built by EAGLE GROUP.